Most recent applications from Liverpool City Council, NSW
17 Moore Street Liverpool NSW 2170
The client will be removing medical equipment from a medical facility. The footpath will be temporarily closed for a few hours, with pedestrians redirected to use the alternative footpath during the occupation works. Traffic Controllers will be on site to manage the traffic flow throughout the operation.
15 days ago
Nino Avenue Austral NSW 2179
Crane Lift
15 days ago
124 Gurner Avenue Austral NSW 2179
Half road civil construction, including drainage, kerb, deep lift pavement.
15 days ago
275 Adams Road Luddenham NSW 2745
Works to be completed within thew grassed verge area adjacent to the site entry including Installation of new Endeavour Energy poles, HV UGOH cables, remove of overhead mains, to commission new power supply to site. We will have EWP’s, Pendulum borer cranes, vac truck, 5.5t excavator, 8t tipper truck & cable jointer Utes onsite.
15 days ago
51 Cumulus Street Austral NSW 2179
Proposed Stormwater Connection to Council Kerb Outlet in accordance with Approved Development Consent
15 days ago
2 Solomon Crescent Horningsea Park NSW 2171
Proposed two storey dwelling
15 days ago
16 Strickland Crescent Ashcroft NSW 2168
Proposed CDC Double Storey Dwelling with Detached Secondary Dwelling
15 days ago
32 Beuk Street Austral NSW 2179
Road opening for driveway
15 days ago
5 Yitpi Street Austral NSW 2179
Construction of single storey dwelling.
15 days ago
115 Welara Avenue Austral NSW 2179
Construction of single storey dwelling, connection of stormwater to existing outlet
15 days ago
17 Dun Road Austral NSW 2179
Driveway construction
15 days ago
5 Pepoi Street Austral NSW 2179
Road opening permit for 5 Pepoi st austral
15 days ago
5 Stanton Street Liverpool NSW 2170
Road Opening - Utility connections to dwellings - Residential
15 days ago
17 Lae Road Holsworthy NSW 2173
To construct a semi-detached dwellings development in conjunction with a two (2) lot subdivision
15 days ago
139 Kelly Street Austral NSW 2179
New Double Storey Dwelling
15 days ago
4 Yabunaru Road Austral NSW 2179
Standard 2 storey home with single driveway.
15 days ago
39 Yabunaru Road Austral NSW 2179
Connection of a domestic utility (for example water, gas and electricity) within the council footpath area adjacent to the property.
15 days ago
11 Holly Avenue Chipping Norton NSW 2170
Stormwater connection to existing kerb and gutter
15 days ago
11 Walder Road Hammondville NSW 2170
Stormwater connection
15 days ago
275 Adams Road Luddenham NSW 2745
Installation of new Endeavour Energy poles, HV UGOH cables, remove of overhead mains, to commission new power supply to site. We will have EWP’s, Pendulum borer cranes, vac truck, 5.5t excavator, 8t tipper truck & cable jointer Utes onsite.
15 days ago
Lot 19 Marraigang Drive Austral NSW 2179
Modification to Development Consent DA-265/2025 (RD-27/2025) under Section 4.55 (1A) of the Environmental Planning and Assessment Act 1979, removal of skylights and removal of front windows
15 days ago
78 Galgalyung Road Austral NSW 2179
Construction of new two storey dwelling
15 days ago
14 Venda Street Austral NSW 2179
Inground fibreglass pool
15 days ago
92 Eighth Avenue Austral NSW 2179
2 storey dwelling with detached studio
15 days ago
57 Kensell Street Austral NSW 2179
Construction of a double storey dwelling.
15 days ago
195 Horologium Road Austral NSW 2179
Construction of double storey dwelling and related landscaping
15 days ago
36 Aroona Avenue Austral NSW 2179
Construction of a single storey dwelling
15 days ago
20 Selway Avenue Moorebank NSW 2170
Demolition of existing structures and the construction of two 2 storey detached dwellings with 2 swimming pools
15 days ago
28-34 Orange Grove Road Warwick Farm NSW 2170
Demolition of an existing structure, new KFC restaurant with ancillary site works and drive thru.
15 days ago
43A Meehan Avenue Hammondville NSW 2170
Double Storey 4-bedroom dwelling being constructed in 43 A Meehan Avenue Hammondville NSW 2173. It is a knock down rebuild site. DA was lodged in April 2024 with approval in October 2025. Construction Certificate issued on 8th of November 2024 and construction started in December 2024 with completion in December 2025. Partial OC was issued in 1st of December 2025 with full OC subject to landscaping. Landscaping has been completed as per concept landscaping plan so applying for full OC. Hence applying for OC
15 days ago