Construction of a secondary dwelling
Recent applications within the last 2 months from Liverpool City Council, NSW
Find out what's happening in your area. Get alerts of new applications near here straight in your email. It's free!
You will receive email only when there are new applications nearby and no more than once per day.
Our Privacy Policy is very simple: We will never share your personal information without your explicit consent. We will not sell your personal information ever.
Create an account or sign in to create an alert.
-
4 Batlow Street Heckenberg NSW 216814 days ago
-
23 Jack O'sullivan Road Moorebank NSW 217014 days ago
Alterations and additions to existing dwelling and construction of detached work shed
-
82 Ninth Avenue Austral NSW 217914 days ago
Two Storey Dwelling
-
25 Dagostino Street Austral NSW 217914 days ago
Double Storey Dwelling
-
64 Barcelona Drive Prestons NSW 217014 days ago
Construction of a single storey residential dwelling
-
14 Estaires Street Austral NSW 217914 days ago
Construction of a new double storey residential dwelling
-
16 Fomalhaut Street Austral NSW 217914 days ago
Two Storey Dwelling
-
39 Fog Street Austral NSW 217914 days ago
Construction of a two storey dwelling
-
16 Gellibrand Road Edmondson Park NSW 217414 days ago
Demolition of existing house, construction of a single storey childcare centre for 80 kids. Stage 1 CC – Demolition of existing house, construction of a single storey childcare centre excluding DA condition 48 pending approval from Council and all works related to the public domain, external works and footpaths. Stage 2 CC - All remaining works relating to public works, external works and footpath as approved by Council.
-
13 Ninth Avenue Austral NSW 217914 days ago
Constrcution of a dual occupancy residential property
-
5-35 Yarrunga Street Prestons NSW 217015 days ago
Mainbrace will be conducting works to connect the warehouse to the main water line, as well as power to the substation. While these works are conducted the first lane of Bernera Road, heading towards the M7 will need to be occupied. This will include the removal and reinstatement of asphalt and line marking.
-
Cross Street Kemps Creek NSW 217815 days ago
Potholing, service locating, slip trenching, geotechnical investigations for finalisation of Sydney Water design for the Kemps Creek Dual Pressure Main Project.
-
Pratten Street Kemps Creek NSW 217815 days ago
Potholing, service locating, slip trenching, geotechnical investigations for finalise Sydney Water design for the Kemps Creek Dual Pressure Main Project
-
Exeter Road Kemps Creek NSW 217815 days ago
Sydney Water KCPM (Kemps Creek Dual Pressure Main) Project. Quickway have been engaged by Sydney Water to deliver the Kemps Creek Dual Pressure Main (KCPM) Project to support future growth of the Western Sydney Southwest Growth Area and align with NSW Government commitments for the region. The Kemps Creek Dual Pressure Mains Project consists of the construction of 7km of dual DN750 pressure wastewater pipes to service the South-West Growth Area (SWGA).
-
5-35 Yarrunga Street Prestons NSW 217015 days ago
Mainbrace will be conducting works to connect the warehouse to the main water line, as well as power to the substation. While these works are conducted the first lane of Bernera Road, heading towards the M7 will need to be occupied. This will include the removal and reinstatement of asphalt and line marking.
-
9 Joseph Street Chipping Norton NSW 217015 days ago
Road Opening for 2 x dwellings
-
33 Gurner Avenue Austral NSW 217915 days ago
Connection of a domestic utility (for example water, gas and electricity) within the council footpath area adjacent to the property.
-
73 Narrami Road Austral NSW 217915 days ago
Water and electrical connection
-
7 Baringa Close Green Valley NSW 216815 days ago
Driveway
-
26 Harrismith Crescent Austral NSW 217915 days ago
Construction of new double storey residential dwelling
-
5-35 Yarrunga Street Prestons NSW 217015 days ago
Mainbrace will be conducting works to connect the warehouse to the main water line, as well as power to the substation. While these works are conducted the first lane of Bernera Road, heading towards the M7 will need to be occupied. This will include the removal and reinstatement of asphalt and line marking.
-
12 Circinus Street Austral NSW 217915 days ago
Construction of a double storey dwelling with a attached garage
-
35 Frontiers Road Edmondson Park NSW 217415 days ago
Proposed swimming pool
-
167 Northumberland Street Liverpool NSW 217015 days ago
Internal fit out of an existing retail space (Retail #01) on Ground Floor for use as a food premise - pizza shop. No cooking of food by barbecue or charcoal method is proposed.
-
47 Shoreline Road Moorebank NSW 217015 days ago
Double Storey Dwelling with attached garage
-
53 Eighteenth Avenue Austral NSW 217915 days ago
Construction of a two-storey dwelling
-
6 Elan Close Moorebank NSW 217015 days ago
Proposed swimming pool
-
46 Jindabyne Street Heckenberg NSW 216815 days ago
Secondary dwelling
-
43A Meehan Avenue Hammondville NSW 217015 days ago
Construction of a two storey dwelling.
-
121 Green Valley Road Green Valley NSW 216815 days ago
Five Lot Strata Subdivision Complying Development Certificate for Multi-Dwelling Housing (terraced)