Anzac Road Moorebank NSW 2170

- Supply traffic control for duration of works; - Excavate and remove 2,224m2 of asphalt and dispose of from Cambridge road as outlined; (3 x sections of road and new 1m verge lanes for entire road approx 660m each side) - Supply and install asphalt by RMS certified contractor in compliance with council and road specifications; - Remove existing high spots of soil and batter verges on roads so further ponding docent occur on sides of road; - Supply and new line marking as required Excavate and remove 2,800m2 of asphalt and dispose of from Anzac road as outlined; (200m2 of pothole repairsExcavate and prepare subgrade got 1m wide verge lane both side of roads for 2600LM; (1.3km each side ofSupply and install asphalt by RMS certified contractor in compliance with council and road specifications; - Excavate and remove 2,624m2 of asphalt and dispose of from Moorebank road as outlined; (3 x sections of road and new 1m verge lanes for entire road approx 580m long; - Supply and install asphalt by RMS certified contractor in compliance with council and road specifications;

External link Read more information

We found this application for you on the planning authority's website ago. It was received by them earlier.

(Source: Liverpool City Council, reference ROC-83/2024)

Have your say on this application

Your comment and details will be sent to Liverpool City Council. They may consider your submission when they decide whether to approve this application. Your name and comment will be posted publicly above.

Create an account or sign in to make a comment

This week

Find PlanningAlerts useful?

This independent project is part of the digital library from the local charity, the OpenAustralia Foundation. PlanningAlerts is powered by small donations from the people who use it to stay informed about changes to their local area. If you find it useful, chip in to support PlanningAlerts.

Back PlanningAlerts