Most recent applications from Liverpool City Council, NSW

15 St Moritz Avenue Austral NSW 2179

Construction of a single storey residential dwelling

About 2 months ago

17 Balanada Avenue Chipping Norton NSW 2170

Demolishing existing dwelling house ,& construction of a semi detached dwelling& torrens title subdivision.

About 2 months ago

495 Fourth Avenue Austral NSW 2179

The works proposed within this application include: - Stormwater installation on the corner of Fourth & Gurner Avenue. - Removal of the existing tree on within the council verge. This tree is located opposite to pit D-1. - Driveway installation including crossovers and laybacks. - Footpath installation. - Removal of exiting pavement and reinstatement. - Please refer to the documentation submitted with this application for details of the above.

2 months ago

30 Haybale Street Austral NSW 2179

Placement of a construction skip bin within the road reserve adjacent to the property frontage on Cultivation Road for the storage and removal of construction waste. The skip bin will be appropriately barricaded and signposted at all times.

2 months ago

Devonshire Road Rossmore NSW 2557

Asphalt shoulder & pavement rectification, and associated works

2 months ago

Sutton Road Ashcroft NSW 2168

Concrete Kerb and Gutter Repair Works

2 months ago

Sutton Road Ashcroft NSW 2168

Asphalt pavement rectification, and associated works

2 months ago

Sutton Road Ashcroft NSW 2168

Concrete Kerb and Gutter Repair Works

2 months ago

Lions Avenue Lurnea NSW 2170

Asphalt pavement rectification, and associated works

2 months ago

1 Alexandria Place Busby NSW 2168

Connection of 3 stormwater lines to council infrastructure

2 months ago

36 Warrawal Avenue Austral NSW 2179

Construction of a two storey dwelling Road opening

2 months ago

27 Sylvanshine Street Austral NSW 2179

Road Opening

2 months ago

Lot 11 Browns Road Austral NSW 2179

Construction of a double storey dwelling with 1.5 garage

2 months ago

18 Bulungga Road Austral NSW 2179

Construction of a double storey house with double garage

2 months ago

90 Fourteenth Avenue Austral NSW 2179

Road Opening - Utility Connection, proposed lot 106 Dagostino Street in Lot 10 DP 1269225, 90 Fourteenth Avenue, Austral

2 months ago

59 Savoy Street Austral NSW 2179

Road Opening- 59 Savoy Street, Austral 2179

2 months ago

5 Osborne Street Chipping Norton NSW 2170

S73 works for water supply to new development

2 months ago

2 Hakea Close Casula NSW 2170

Erection of a new concrete swimming

2 months ago

14 Corrimal Street Prestons NSW 2170

Construction of a single storey dwelling with an attached double garage.

2 months ago

96 South Liverpool Road Heckenberg NSW 2168

Granny Flat

2 months ago

21 Carnamah Road Austral NSW 2179

Construction of a double storey 5 bedrooms dwelling

2 months ago

Carnes Hill Shopping Centre 245 Cowpasture Road Carnes Hill NSW 2171

New seafood store at carnes hill marketplace

2 months ago

5 Pilbarra Place Cartwright NSW 2168

Alterations and Additions to the Existing Dwelling and Construction of a Secondary Dwelling

2 months ago

14 Wendouree Street Busby NSW 2168

Completion of a Single Storey Dwelling

2 months ago

47 Horologium Road Austral NSW 2179

Construction of a Dwelling and Attached Secondary Dwelling

2 months ago

36 Parhelion Street Austral NSW 2179

Construction of a Two Storey Dwelling & Retaining Walls

2 months ago

18 Clover Avenue Casula NSW 2170

Construction of a Two Storey Dwelling and Attached Secondary Dwelling

2 months ago

85 Driftway Street Austral NSW 2179

Two-storey dwelling

2 months ago

123 Horologium Road Austral NSW 2179

Primary Dwelling and Secondary Dwelling

2 months ago

4 Ash Road Prestons NSW 2170

Operation of an existing concrete batching plant (CBP) with a proposed production capacity of 500,000 tonnes per annum of concrete and concrete products. The DA seeks consent to increase the current approved production capacity from 300,000 tonnes per annum to 500,000 tonnes per annum. Please also refer to related DA264/2018/C applying to 300,000 tonnes per annum

2 months ago