35 Clarence Street, Sydney, NSW
- Description
- Bass Point Quarry - It is proposed that existing limits to product truck despatch during the morning shoulder period (5:00am to 7:00am) be modified with the only change to existing approved product despatch operations including the following. An increase to the maximum number of product trucks that may be despatched from the Quarry between 5:00am and 6:00am to 27 trucks (an increase of four trucks) An increase to the maximum number of product trucks that may be despatched from the Quarry between 6:00am and 7:00am to 38 trucks (an increase of 15 trucks).
- Planning Authority
-
NSW Department of Planning Major Project Assessments
View source
- Reference number
-
MP 08_0143This was created by NSW Department of Planning Major Project Assessments to identify this application. You will need this if you talk directly with them or use their website.
-
Date sourced
- We found this application on the planning authority's website on , almost 8 years ago. The date it was received by them was not recorded.
-
Comments
- Be the first to comment
Public comments on this application
Comments made here will be sent to NSW Department of Planning Major Project Assessments.
”