198 Excelsior Avenue, Castle Hill NSW 2154
- Description
- Construction of a 56 place ‘Centre-Based Child Care Facility’. The development includes the removal of three trees, excavation, site preparation, and construction of a two storey child care centre with basement level car parking. Stage 1 CC (S1) - Bulk excavation, shoring, basement footings and construction of basement floor slab only. Stage 2 CC (S2) - Structure up to ground floor/transfer slab only. Stage 3 CC (S3) - Construction of external structure including the roof only. Stage 4 CC (S4) - Construction of external façade and works to the roof level only. Stage 5 CC (S5) - All remaining works. Section 4.56 Modification to an Approved 56 Place Centre Based Child Care Facility- 230070/05
- Planning Authority
-
The Hills Shire Council
View source
- Reference number
-
326/2024/PC/AThis was created by The Hills Shire Council to identify this application. You will need this if you talk directly with them or use their website.
-
Date sourced
- We found this application on the planning authority's website on , 8 months ago. It was received by them earlier.
-
Notified
- 242 people were notified of this application via Planning Alerts email alerts
-
Comments
- Be the first to comment
Public comments on this application
Comments made here will be sent to The Hills Shire Council.
”