, ,

Edmondson Park - Section 75W Request to modify the Edmondson Park South Concept Plan as follows: • introduce a maximum gross floor area control of 140,389 m2 • increase minimum residential yields in the Town Centre North from 440 to 3,030 - 3,286 • change the residential mix to include residential flat buildings, mixed use apartment buildings, mansion apartments, terrace houses, terrace cottages, detached cottages and studio dwellings • adjust boundary to include approximately 2.5 ha of land owned by Office of Strategic Lands • reduce the size of the school site, to between 2ha – 6 ha (from 8 ha) • changes to the road network • introduce new design guidelines.

External link Read more information

1 Comment

Create an account or sign in to have your say by adding your own comment.

  1. Liliana Samson commented

    I vehemently oppose this request.
    The infrastructure around Edmondson Park will not cope with the proposed increase in dwelling.
    1. The station parking is already beyond full capacity. Cars have to park along nearby roads which are mostly one lane, in front of residential streets. Some cars even park illegally on no parking area. The government is opposed to build a multi storey car park, so no one knows when the parking problem will be solved.
    2. the roads in and out of Edmondson Park is already jammed during peak hours. Camden Valley Way is only two lanes and Campbelltown Road is one lane each way.
    3. There are no local parks and green scape avaiable yet.
    4. The schools are already at full capacity
    NSW government must realise that for a city to be able to grow, the infrastructure must be established first. You can't just keep clearing land and build suburbs without proper planning. In the end, it's only the developers and builders who profit.
    I bought a property in Edmondson Park because I don't want to see high rise buildings and terrace house, I wanted to enjoy the space and clear air.
    I hope & pray that this proposal will be rejected

Have your say on this application

You're too late! The period for officially commenting on this application finished over 5 years ago. It lasted for 27 days. If you chose to comment now, your comment will still be displayed here and be sent to the planning authority but it will not be officially considered by the planning authority.

Your comment and details will be sent to NSW Department of Planning Major Project Assessments. Your name and comment will be posted publicly above.

Create an account or sign in to make a comment

This week

Find PlanningAlerts useful?

This independent project is part of the digital library from the local charity, the OpenAustralia Foundation. PlanningAlerts is powered by small donations from the people who use it to stay informed about changes to their local area. If you find it useful, chip in to support PlanningAlerts.

Back PlanningAlerts