Recent applications from NSW Department of Planning Major Project Assessments, NSW

It looks like something might be wrong. The latest application was received 4 months ago. Why?
Burdett Street , Hornsby
4 months ago
Hornsby Hospital - The proposal involves: • construction of a four level (plus plant) clinical building within the south-east corner of the hospital campus with a floor area of 14,210 sqm • demolition of 10 existing hospital buildings, one residential dwelling and removal of trees • provision of 82 at-grade car parking spaces • landscaping and perimeter fencing
60 Charlotte Street , Campsie
4 months ago
Former Sunbeam Factory Campsie - Increase the maximum building height on Proposed Lot 41 and consequently reconcile the relevant condition of the Concept Plan approval to permit: a maximum of 7 storeys for development fronting New Alfred Street; a maximum of 6 storeys for the remainder of the site; Amend Further Assessment Requirement No. 13(b) to explicitly articulate that Rights of Way and Easements should only be created where required; and Streamline and update the approved Final Statement of Commitments for the Concept Plan approval.
Nelson Street Pedestrian Bridge , Bondi Junction
4 months ago
Nelson Street Pedestrian Bridge - Installation of two backlit advertising signs and a new safety screen on the Nelson Street Pedestrian Bridge along Syd Einfeld Drive, Bondi Junction.
Lot 30, 31 and part lot 33 in DP1161771 , Eastern Creek
4 months ago
Bungarribee Industrial Estate - Construction, operation and fit out of a freight transport, warehouse and distribution facility comprising warehouse, associated offices, workshop, weighbridge, refuelling facility, truck wash, gatehouses, car parking and landscaping for Toll IPEC.
Mechanical and Manufacturing Engineering Buildings
5 months ago
University of New South Wales - Kensington Campus - Alterations, additions and refurbishments to the Mechanical and Manufacturing Engineering Building (Building J17); alterations and refurbishments to the Willis Annex (Building J18); and upgrading Willis Lane with associated public domain works
Lot 30, 31 and part lot 33 in DP1161771 , Eastern Creek
5 months ago
Bungarribee Industrial Estate - Construction, operation and fit out of a freight transport, warehouse and distribution facility comprising warehouse, associated offices, workshop, weighbridge, refuelling facility, truck wash, gatehouses, car parking and landscaping for Toll IPEC.
Mechanical and Manufacturing Engineering Buildings
5 months ago
University of New South Wales - Kensington Campus - Alterations, additions and refurbishments to the Mechanical and Manufacturing Engineering Building (Building J17); alterations and refurbishments to the Willis Annex (Building J18); and upgrading Willis Lane with associated public domain works
Nundle Road , Woolomin
5 months ago
Chaffey Dam - Undertake Dam Safety Upgrade and increase storage capacity of Chaffey Dam.
Pacific Highway , Woolgoolga to Ballina
5 months ago
Pacific Highway Upgrade - Woolgoolga to Ballina - The upgrade of the Pacific Highway between Woolgoolga and Ballina. The southern end of the project would tie-in to the northern end of the Sapphire to Woolgoolga upgrade (about six kilometres north of Woolgoolga) and the northern end would tie-in to the southern end of the Ballina bypass (about six kilometres to the south of Ballina). The project excludes the approved highway upgrades at Glenugie and Devils Pulpit, located between Woolgoolga and Ballina. The key features of the project include: 155 kilometres of four-lane dual carriageways (two lanes in each direction separated by a median); grade separated interchanges at Range Road, Glenugie, Tyndale, Maclean, Yamba Road (Harwood), Watts Lane (Harwood), Woombah (Iluka Road), Woodburn, Broadwater and Wardell; bypasses of South Grafton, Ulmarra, Woodburn, Broadwater and Wardell; bridges over creeks and floodplains, including major bridge crossings of the Clarence and Richmond rivers; service roads and access roads, including overpasses and underpasses, to maintain connections to existing local roads and properties; rest areas at Pine Brush (near Tucabia), north of Mororo Road and north of the Richmond River; heavy vehicle inspection station near Halfway Creek and north of the Richmond River; and the realignment of 500 metres of Picaninny Creek and 200 metres of Eversons Creek.
26 Broadway , Chippendale
5 months ago
Carlton United Breweries Site - Adaptive re-use of the existing Country Clare Hotel and administration building as a boutique hotel and food and drink premises.
Sofala
5 months ago
Crudine Ridge Wind Farm - Construction and operation of a wind farm comprising between 70 and 110 turbines, at between 1.5 and 3.4 Megawatts each, located across a 16 km span along Crudine Ridge. Associated infrastructure includes underground connection (where possible) to a collector substation, facilities building, a new 13 km easement along which a 132 kV power line will be installed to connect to existing transmission lines, a switching substation, access tracks and temporary concrete batching plant. Controlled Action under EPBC Act The Commonwealth Department of Sustainability, Environment, Water, Populations and Communities determined that the proposed development is a "controlled action" under the Environment Protection and Biodiversity Conservation Act 1999 (the EPBC Act). The EPBC Act Part 3, Division 1 controlling provisions are sections - 18 and 18A (Listed threatened species and communities), and - 20 and 20A (Listed migratory species). The project will be assessed by way of accredited assessment process under section 87 of the EPBC Act. The accredited assessment process for the proposed development is Part 3A of the New South Wales Environmental Planning and Assessment Act 1979.
40 km west of Pooncarie , Mining Lease 1504 , Unincorporated
5 months ago
Ginkgo Mineral Sands Mine - Modification to the Ginkgo Mineral Sands Mine Development Consent (see attached Environmental Assessment)
Gregory Street , Steve Eagleton Drive , South West Rocks
5 months ago
Settlers Ridge, South West Rocks - Settlers Ridge, South West Rocks 220 lot residential subdivision and Biobanking proposal
Broke Road , Broke
6 months ago
Bulga Mining Complex - Modifications to the Bulga Mining Complex Development Consent (see attached Environmental Assessment).
129 Mitchell Avenue , Weston
6 months ago
Weston Aluminium Dross Recycling Facility - Weston Aluminium is seeking permission to undertake a 12 month trial to process up to 3000 tonnes of Mixed (combined First Cut and Second Cut) Spent Potlining Material in existing rotary furnaces
129 Mitchell Avenue , Weston
6 months ago
Weston Aluminium Dross Recycling Facility - Weston Aluminium is seeking permission to undertake a 12 month trial to process up to 3000 tonnes of Mixed (combined First Cut and Second Cut) Spent Potlining Material in existing rotary furnace
Mitchell Highway , East Guyong
6 months ago
East Guyong Quarry - Modification of the approved alignment of an internal haul road at the East Guyong Quarry.
Driver Avenue , Moore Park
6 months ago
Sydney Cricket Ground - Major Project MP 08_0103 MOD 3 dated 14 November 2012
Corner Wool Road and Naval College Road , Vincentia
6 months ago
Vincentia Coastal Village - Modification of Statement of Commitment No. 59 to the Concept Plan and Project Approvals to replace the pedestrian/cycleway underpass at Naval College Road with a mid-block signalised pedestrian crossing across Naval College Road.
6 months ago
Cruise Passenger Terminal, White Bay, Balmain - Clarify the extent of the Project Approval in relation to impacts of the project on railway sidings at the site.
Lot 10 in Dp 1065973
6 months ago
Glebe Island - Proposed temporary exhibition facility (Glebe Island Expo).
Multiple locations
6 months ago
North West Rail Link - Minor change to the location of Showground Station, to the south east and parallel with Carrington Road, and associated modification of the horizontal alignment of the tunnels; Vertical alignment changes to accommodate the changed location of Showground Station; Change to Showground Station construction site boundary (Site 6); Change to the Showground Road and Carrington Road construction access/egress arrangements.
Broke Road , Broke
6 months ago
Bulga Mining Complex - Modifications to the Bulga Mining Complex Development Consent (see attached Environmental Assessment).
The Crescent , Penrith
6 months ago
North Penrith Defence Site - Bulk earthworks for remaining stages, subdivision, landscaping, infrastructure and road works for stages 2B and 2C of the North Penrith development
The Crescent , Penrith
6 months ago
North Penrith Defence site - Infrastructure, landscaping and subdivision works for Stage 2D of the North Penrith development
The Crescent , Penrith
6 months ago
North Penrith Defence site - Infrastructure, landscaping and subdivision works for Stage 3B of the North Penrith development
Hickson Road , Sydney
6 months ago
Barangaroo (formerly East Darling Harbour) - A Administrative Modification to the terms of approval of MP10_0027 (Commercial Building C5) to vary the wording of Condition A7 to allow for the progressive validation of remediation works.
Hickson Road , Sydney
6 months ago
Barangaroo (formerly East Darling Harbour) - Section 75W application for the construction of a district cooling plant
High Street, via Gate 2 , Kensington
6 months ago
University of New South Wales - Kensington Campus - The proposal involves: - removal of 84 at-grade car parking spaces and removal of 37 trees - bulk excavation works - construction of a 10 storey building, comprising approximately 20,000 sqm of floor space, to accommodate research areas, teaching and learning space, office areas, exhibition area, shell space and ancillary retail space - new loading facilities - landscaping works. The Environmental Impact Statement and other accompanying documents may be inspected from Thursday 22 November 2012 until Friday 21 December 2012 during regular business hours at: - Department of Planning & Infrastructure, Information Centre, 23-33 Bridge Street, Sydney; and - Randwick City Council, Customer Service Centre, 30 Frances Street, Randwick.
Hickson Road , Sydney
6 months ago
Barangaroo Central - The proposed development includes a waterfront promenade and interim public domain works at Barangaroo Central. Approval is also sought for events as outlined in the report attached.